Kinross Gold – Mercury Abatement System Addition
Morrison-Maierle was contracted to analyze Kinross Gold’s refinery building structure prior to the addition of the support platform for their new Mercury Abatement System 2 Addition project. The analysis included creating a structural model of the existing structure along with determining and applying the applicable structure loads.
Engineers also provided design for the support platform and seismic resisting elements. Analysis of a separate existing platform to support a new mist
eliminator was also provided.