Founded in 1993, Kinross Gold Corporation is a gold mining company with a diverse portfolio of projects throughout the United States, Brazil, Chile, Ghana, Mauritania, and Russia. Headquartered in Toronto, Canada, Kinross employs approximately 9,000 people worldwide.
The Round Mountain Mine is an open pit mine located in central Nevada, one of the most prolific mining districts in the world. The location of the proposed Mill Flotation Expansion Project is adjacent to the existing Round Mountain Mill facility approximately 55 miles north of Tonopah, in Hye County, Nevada. The mine and mill are operated by Round Mountain Gold Corporation (RMGC).
Value Engineering Study
Changes implemented during the study saved the mine $5,733,530 compared to the initial design.
Structural engineering
Process engineering
Civil engineering
Electrical engineering
Mechanical HVAC engineering
3D modeling
RMGC wanted to study the potential for gold recovery in their milling facility through the expansion of their flotation circuit. They had initially worked with Samuel Engineering who developed a feasibility study proposing the Mill Flotation Expansion Project. Morrison-Maierle’s Value Engineering Study Scope of Work evaluates the proposed project to ensure
that the project scope has been optimized.
Starting with key project elements, as outlined by RMGC, Morrison-Maierle adopted a “nothing is sacred” approach that supported challenging assumptions and questioning all previous project design tactics. By challenging original design assumptions, while further developing design approaches, the team was able to leverage their recent project site design and construction experience to yield safe, constructible, maintenance-friendly, and economical design solutions.
As a result, the Value Engineering Study focused on the following key project elements:
Morrison-Maierle drafted and transmitted it to RMGC for review. Changes implemented during the study saved Round Mountain $5,733,530 compared to the initial design.
Kinross selected Morrison-Maierle to perform detailed engineering for various infrastructure and processing needs for their significant mine pit relocation and expansion.
The City of Missoula Cogeneration System uses the biogas produced at its wastewater treatment plant to create its own heat and electricity to power the plant.
Morrison-Maierle to conduct a non-destructive structural assessment of three cyanide liquid holding tanks at the Marigold mine.