Modernizing the headworks without interrupting service to the community

When the City of Great Falls needed a wastewater treatment plant screen replacement, Morrison-Maierle engineers faced a high-stakes challenge: modernize the headworks with an ineffective screen inside an active facility while maintaining continuous wastewater service. The Great Falls Wastewater Treatment Plant headworks screening replacement combined bypass pumping, confined-space rehabilitation, equipment selection, and coordinated electrical, controls, HVAC, and access improvements.

Through careful planning and flexible design, the team delivered a cost-effective, efficient solution that improves debris removal, operator safety, odor control, and long-term reliability.