Now, the City of Billings has an improved water distribution system that can meet peak hour needs while increasing flexibility to handle variable water demands. It also saved the cost of building a reservoir now, which would have caused operational and water quality issues in the near future.
Billings Fox Pump Station
Maintaining Pressure at Peak Demand
The City of Billings had problems with a pressure zone near Skyview High School. This zone was experiencing extreme demand fluctuations pushing the existing closed-loop Fox Pump Station beyond its capacity limits. The station also had no storage and was unable to meet peak-hour demands.
Additionally, the smallest pump’s impeller was deteriorating more quickly than expected due to cavitation.
The city needed to solve the pressure fluctuation issue and implement a system to maintain adequate pressure during peak demands. They hired Morrison-Maierle to study, model, and evaluate this pumping capacity issue.
Services & Highlights
-
Civil design
-
Closed-loop pump
-
Construction administration
-
Construction phase services
-
Flexible design for future expansion
-
Integration and controls design
-
Mechanical design
-
Pump station study
-
Structural design
Expansion or New Construction?
The plan before the study was to construct a reservoir and expand the pump station. However, the study indicated that it would be better to construct a new closed-loop pump station. Furthermore, a water age analysis showed that adding a reservoir now could cause significant water quality problems during months when demand was significantly less.
Morrison-Maierle designed a new closed-loop pump station with a manufacturer-supplied, prebuilt pumping system inside a customized building. The station capacity was designed for future expansion when water demands increase. And, with the updated system, a new reservoir can be added without concerns about water age.
A Solution for Now and the Future
Related Projects
Bozeman Water Reclamation Facility
The Bozeman Water Reclamation Facility has an advanced nutrient removal bioreactor and treats and reclaims wastewater to the levels needed to meet effluent limits.
Town of Plains Wastewater Treatment Plant Relocation
The moving Clark Fork River caused the Town of Plains, Montana, to design and build a new wastewater treatment plant in a new location with all processes under one roof.